A contract for importing goods should settle six things in writing. They are the governing law, delivery and the risk of loss in transit, the goods’ specification and inspection, payment protection, your remedies, and where disputes will be decided. Your supplier’s country may have joined the United Nations Convention on Contracts for the International Sale of Goods (CISG). If it has, and has made no article 92 declaration excluding the Convention’s sales rules, the Convention supplies the default rules for a Minnesota buyer unless the contract excludes it. Articles 2 and 3 of the Convention also leave out some sales, such as one by auction or one where you supply a substantial part of the materials. When the Convention does not apply, Minnesota’s Uniform Commercial Code (UCC) applies to a sale bearing an appropriate relation to Minnesota, unless the contract validly chooses another law. This article covers the purchase contract as a whole; my contracts practice page covers the wider set of business agreements.
What Terms Should a Contract for Importing Goods Cover?
A purchase contract with a foreign supplier should cover governing law, delivery and risk, specifications and inspection, payment, remedies, and the forum for disputes. A shipping term alone leaves most of those open. The International Trade Administration (ITA) explains in its Incoterms guidance that an Incoterm does not identify the goods or the price, set the method or timing of payment, say when title passes, or “address liability for the failure to provide the goods in conformity with the contract of sale, delayed delivery, nor dispute resolution mechanisms.” The rest of the contract should fill those gaps.
A workable import contract carries these terms:
- Governing law: whether the CISG applies or is excluded, and which country’s law fills the rest.
- Delivery and risk: an Incoterms rule, its version, and a named place.
- Specifications and inspection: a written description or approved sample, where and when you inspect, and how fast you must report defects.
- Payment: when money moves relative to shipment and inspection.
- Remedies: replacement, refund, or damages, and any limits on them.
- Disputes: a court or arbitration seat whose decision can reach the supplier’s assets.
Many of these terms track the issues in vendor contracts for Minnesota businesses, where Minnesota’s UCC governs a domestic sale of goods. An import adds a second legal system, a carrier, a customs border, and a supplier whose assets sit abroad.
When Does the CISG Govern Instead of Minnesota’s UCC?
The CISG governs your purchase when you and the supplier have places of business in different countries that are both Contracting States, unless your contract excludes it. It does not supply its sales rules when the supplier’s country has declared under article 92 that it is not bound by them. Article 3 also takes some manufacturing and service contracts outside it. Article 2 excludes some sales, including sales “by auction” and sales “of ships, vessels, hovercraft or aircraft.” Under article 92, a Contracting State may declare that it will not be bound by Part III, which holds articles 25 through 88. Those include the rules this page quotes on quality, notice, risk, and remedies. Such a State “is not to be considered a Contracting State within paragraph (1) of article 1 of this Convention in respect of matters governed by the Part to which the declaration applies.” UNCITRAL’s status table records that Saudi Arabia “declared that it would not be bound by Part III.” Article 1 of the Convention says it “applies to contracts of sale of goods between parties whose places of business are in different States” and, in the first case it lists, “when the States are Contracting States.” The United States is one, and the UNCITRAL status table lists the others. Article 3 sets two limits for a manufacturing order. It treats one as a sale “unless the party who orders the goods undertakes to supply a substantial part of the materials necessary for such manufacture or production,” and it excludes a contract in which the “preponderant part of the obligations of the party who furnishes the goods consists in the supply of labour or other services.”
The Eighth Circuit applied that rule to a Minnesota buyer in Brands International Corp. v. Reach Companies, LLC, 103 F.4th 501 (8th Cir. 2024). A Minnesota distributor had sent a purchase order to a Canadian hand sanitizer maker and argued that Minnesota law applied. The court held that “the CISG governs this claim in the absence of an express, affirmative opt-out,” because the parties were in different Contracting States, the contract was for goods, and neither side had excluded the Convention.
If the supplier’s country has not joined the Convention, article 1(1)(a) does not reach the sale. Article 1(1)(b) adds a second case, “when the rules of private international law lead to the application of the law of a Contracting State,” but the status table records that the United States “declared that it would not be bound by paragraph 1 (b) of article 1.” A sale between two businesses whose places of business are both in the United States is also outside article 1. Buying from a U.S. importer or distributor therefore puts the purchase under domestic law, such as Minnesota’s UCC.
How Do You Opt Out of the CISG, and Should You?
You opt out by saying so in the contract. Article 6 provides that “The parties may exclude the application of this Convention or, subject to article 12, derogate from or vary the effect of any of its provisions.” In Brands, the Eighth Circuit said parties may opt out under article 6 “but they must do so expressly,” and it quoted an earlier Fifth Circuit decision: “Where parties seek to apply a signatory’s domestic law in lieu of the CISG, they must affirmatively opt-out of the CISG.” A clause choosing Minnesota law that never mentions the Convention does not expressly exclude it, so a sentence naming the Convention and excluding it removes the doubt.
Whether to opt out depends on which differences matter for your goods:
- Written terms. Article 11 says a sale contract “need not be concluded in or evidenced by writing and is not subject to any other requirement as to form.” Under article 12, that rule does not apply where any party has its place of business in a Contracting State that “has made a declaration under article 96 of this Convention.” By contrast, Minn. Stat. § 336.2-201 provides that a sale of goods for $500 or more “is not enforceable by way of action or defense unless there is a record” signed by the party against whom enforcement is sought, subject to that section’s exceptions.
- Defect notice. The Convention and the UCC word their notice rules differently, as the inspection terms show.
- Familiarity. A Minnesota court and your own team know the UCC; a supplier abroad may know the Convention better than any one country’s law.
If you exclude the Convention, the contract should name the law that replaces it, because an exclusion alone leaves that question open. Minn. Stat. § 336.1-301 lets the parties to a transaction that “bears a reasonable relation to this state and also to another state or nation” agree that the law of either shall govern their rights and duties, except as that section otherwise provides. “In the absence of an agreement effective under subsection (a), and except as provided in subsection (c), the Uniform Commercial Code applies to transactions bearing an appropriate relation to this state.” How Minnesota treats the choice-of-law clause itself, including the statutes that override one, is a separate drafting question with its own page.
How Do Incoterms Allocate Delivery, Risk, and Customs Duties?
An Incoterms rule the contract adopts assigns the shipping tasks, costs, and risks between you and the supplier. The ITA describes the Incoterms as 11 rules issued by the International Chamber of Commerce that “specify who is responsible for paying for and managing the shipment, insurance, documentation, customs clearance, and other logistical activities.” Seven rules apply to any mode of transport (EXW, FCA, CPT, CIP, DAP, DPU, DDP) and four to sea and inland waterway transport (FAS, FOB, CFR, CIF).
EXW and DDP sit at opposite ends of the range. The ITA’s United Kingdom import guide describes Ex Works (EXW) as making the buyer responsible “for everything from export clearance at the start of the journey to import clearance and payment of customs duties at the end of the journey,” and Delivered Duty Paid (DDP) as placing all obligations on the seller. The ITA also says the parties “need to clearly specify the chosen version of Incoterms being used.” I suggest writing the rule, the place, and “Incoterms 2020” together, because Minnesota’s UCC gives its own meaning to the same letters. Minn. Stat. § 336.2-319 defines F.O.B. “Unless otherwise agreed,” so a bare “FOB” in a UCC contract invites a dispute over which definition the parties meant.
When the contract names no delivery term, the default rules place transit risk on you early. Under the Convention, when the sale involves carriage and the seller need not hand the goods over at a particular place, “the risk passes to the buyer when the goods are handed over to the first carrier for transmission to the buyer in accordance with the contract of sale” (article 67), but “the risk does not pass to the buyer until the goods are clearly identified to the contract, whether by markings on the goods, by shipping documents, by notice given to the buyer or otherwise.” Under Minn. Stat. § 336.2-509, “Where the contract requires or authorizes the seller to ship the goods by carrier,” and when the contract does not require delivery at a particular destination, “the risk of loss passes to the buyer when the goods are duly delivered to the carrier.” That section is “subject to contrary agreement of the parties and to the provisions of this article on sale on approval (section 336.2-327) and on effect of breach on risk of loss (section 336.2-510).”
Both bodies of law limit those risk rules when the goods are defective or the supplier is at fault. Under Minn. Stat. § 336.2-510, “Where a tender or delivery of goods so fails to conform to the contract as to give a right of rejection the risk of their loss remains on the seller until cure or acceptance.” Under the Convention, a loss after the risk passes does not discharge you from paying the price “unless the loss or damage is due to an act or omission of the seller” (article 66), and “If the seller has committed a fundamental breach of contract, articles 67, 68 and 69 do not impair the remedies available to the buyer on account of the breach” (article 70). I suggest cargo insurance that starts when your chosen rule moves the risk to you, because a transit loss of conforming goods after that moment falls on you. The exception is a loss the supplier’s own act or omission caused.
As between you and the supplier, customs duties fall on whichever party the Incoterm makes responsible for import clearance; the ITA’s guide says Incoterms “establish the obligations of the seller and the buyer, including which party is responsible for import.” The same guide adds: “Responsibility for meeting customs obligations at import falls on the importer of record.” Tariff rates and product classification are outside this page. U.S. Customs and Border Protection’s import and export guidance covers the process, and a tariff pass-through clause is how a purchase contract allocates the cost of a tariff change between the parties.
What Inspection and Quality Terms Protect an Importer?
The terms that protect an importer state the goods’ specification in writing, set where and when inspection happens, and fix how defects are reported. Both bodies of law cut off a buyer who reports late. Under the Convention, the seller “must deliver goods which are of the quantity, quality and description required by the contract” (article 35). Under Minn. Stat. § 336.2-313, a description of the goods made part of the basis of the bargain “creates an express warranty that the goods shall conform to the description,” and a sample or model does the same for “the whole of the goods.” A signed specification sheet and a retained approved sample give you something concrete to measure each shipment against.
Inspection timing is where imports differ from local purchases:
- Convention. The buyer “must examine the goods, or cause them to be examined, within as short a period as is practicable in the circumstances,” but “If the contract involves carriage of the goods, examination may be deferred until after the goods have arrived at their destination” (article 38).
- UCC. Under Minn. Stat. § 336.2-513, “When the seller is required or authorized to send the goods to the buyer, the inspection may be after their arrival.” The buyer’s right to inspect goods under that section carries its own timing and notice rules.
- Pre-shipment inspection. If you hire an inspector at the factory, section 336.2-513 says an agreed place or method of inspection “is presumed to be exclusive but unless otherwise expressly agreed it does not postpone identification or shift the place for delivery or for passing the risk of loss.” I suggest stating whether a factory inspection replaces or adds to inspection on arrival, because the statute presumes the agreed method is the only one. When the Convention governs, a factory inspection can also start your notice clock. BP Oil International, Ltd. v. Empresa Estatal Petroleos de Ecuador, 332 F.3d 333 (5th Cir. 2003) is a decision that does not bind Minnesota courts. There, the contract called for CFR delivery and for testing the gasoline’s quality at the port of departure. The buyer had appointed the testing company. The Fifth Circuit said that, “Having appointed Saybolt to test the gasoline,” the buyer “ought to have discovered” the defect before the cargo left Texas under article 39(1), and it reversed the judgment for the buyer and remanded. I suggest reading an inspector’s report as soon as it arrives, because under that reasoning your notice period for defects the inspector should have found can start at the factory.
Reporting defects has its own deadline language. Under Minn. Stat. § 336.2-602, “Rejection of goods must be within a reasonable time after their delivery or tender. It is ineffective unless the buyer seasonably notifies the seller.” Under Minn. Stat. § 336.2-605, “The buyer’s failure to state in connection with rejection a particular defect which is ascertainable by reasonable inspection precludes the buyer from relying on the unstated defect to justify rejection or to establish breach” in two cases: “where the seller could have cured it if stated seasonably,” or “between merchants when the seller has after rejection made a request in writing for a full and final written statement of all defects on which the buyer proposes to rely.” I suggest naming every defect your inspection finds in a rejection notice, because a defect left out can be lost in those cases. After you accept goods, Minn. Stat. § 336.2-607 requires notice of breach “within a reasonable time after the buyer discovers or should have discovered any breach” or the buyer is “barred from any remedy.”
Because “reasonable time” is open-ended, I suggest a contract term that names a fixed number of days for inspection and defect notice after arrival, which gives both sides a date to work from. That term can bind you as well as the supplier. Under Minn. Stat. § 336.1-302, “Whenever the Uniform Commercial Code requires an action to be taken within a reasonable time, a time that is not manifestly unreasonable may be fixed by agreement,” and article 6 lets the parties to a Convention sale vary the effect of its provisions. A window counted from arrival replaces the start point each law otherwise uses: “after the buyer discovers or should have discovered any breach” under Minn. Stat. § 336.2-607, and “after he has discovered it or ought to have discovered it” under article 39(1). I suggest giving defects that inspection on arrival could not reveal their own notice period, counted from discovery, because a window that closes before a hidden defect appears leaves you no time to report it.
The Convention’s notice rule is in article 39: “The buyer loses the right to rely on a lack of conformity of the goods if he does not give notice to the seller specifying the nature of the lack of conformity within a reasonable time after he has discovered it or ought to have discovered it.” The buyer also loses that right “if he does not give the seller notice thereof at the latest within a period of two years from the date on which the goods were actually handed over to the buyer, unless this time limit is inconsistent with a contractual period of guarantee.” Check the current text of the Convention before relying on these periods. Under article 40, the seller “is not entitled to rely on the provisions of articles 38 and 39 if the lack of conformity relates to facts of which he knew or could not have been unaware and which he did not disclose to the buyer.” Under article 44, “Notwithstanding the provisions of paragraph (1) of article 39,” a buyer with a “reasonable excuse for his failure to give the required notice” may “reduce the price in accordance with article 50 or claim damages, except for loss of profit.” Article 44 refers to the first paragraph of article 39 and does not mention its second paragraph.
A supplier’s form may also offer only replacement or refund. Minn. Stat. § 336.2-719 lets a sale contract limit remedies, “as by limiting the buyer’s remedies to return of the goods and repayment of the price or to repair and replacement of nonconforming goods or parts,” but that permission is “Subject to the provisions of subsections (2) and (3) of this section and of the preceding section on liquidation and limitation of damages.” The same subsection provides that “resort to a remedy as provided is optional unless the remedy is expressly agreed to be exclusive, in which case it is the sole remedy.” The section also provides that “Where circumstances cause an exclusive or limited remedy to fail of its essential purpose, remedy may be had as provided in this chapter,” and that “Consequential damages may be limited or excluded unless the limitation or exclusion is unconscionable. Limitation of consequential damages for injury to the person in the case of consumer goods is prima facie unconscionable but limitation of damages where the loss is commercial is not.” The rules on express and implied warranties, including how a disclaimer must be worded, apply when the UCC governs.
How Can an Importer Avoid Paying for Goods It Never Receives?
An importer limits that risk by tying each payment to a document or event you can check: shipment documents, an inspection result, or arrival. Paying against documents can mean paying before you inspect. Under article 58 of the Convention, the buyer need not pay the price until it has had an “opportunity to examine the goods, unless the procedures for delivery or payment agreed upon by the parties are inconsistent with his having such an opportunity.” Under Minn. Stat. § 336.2-513, unless otherwise agreed, “the buyer is not entitled to inspect the goods before payment of the price when the contract provides” for payment against documents of title, “except where such payment is due only after the goods are to become available for inspection.” Under Minn. Stat. § 336.2-319, the F.O.B. vessel term and the F.A.S. term call for payment against documents unless the contract says otherwise: “Under the term F.O.B. vessel or F.A.S. unless otherwise agreed the buyer must make payment against tender of the required documents and the seller may not tender nor the buyer demand delivery of the goods in substitution for the documents.”
The payment structures that move money and goods together include:
- Deposit and balance against documents: a partial deposit, with the balance due when the supplier presents the bill of lading and inspection certificate you named in the contract.
- Letter of credit: a bank pays the supplier only against the documents the credit lists; the letter of credit reimbursement clauses in your bank agreement set what you owe the bank.
- Payment after arrival: open-account terms, which favor you and which a new supplier may refuse.
Your own payment duty is strict once the contract fixes it. In Brands, the Minnesota buyer had agreed to cash on delivery, did not pay after three deliveries, and argued it was waiting for an invoice. Quoting article 59, the Eighth Circuit held that the buyer had to “pay the price on the date fixed by or determinable from the contract . . . without the need for any request or compliance with any formality,” and affirmed judgment for the supplier.
The Convention also lets you hold back performance when the supplier’s ability to perform collapses. Under article 71, a party “may suspend the performance of his obligations if, after the conclusion of the contract, it becomes apparent that the other party will not perform a substantial part of his obligations as a result of” causes that include “a serious deficiency in his ability to perform or in his creditworthiness.” The suspending party “must immediately give notice of the suspension to the other party,” and it must resume performing if the other party provides adequate assurance that it will perform. If the supplier prices in a foreign currency, a currency adjustment clause addresses exchange-rate movement between order and payment.
What Dispute Terms Work Against a Foreign Supplier?
The dispute terms that work name a forum whose decision can reach the supplier’s assets, and a court judgment and an arbitration award travel differently. Minnesota enforces forum-selection clauses: in Hauenstein & Bermeister, Inc. v. Met-Fab Industries, Inc., 320 N.W.2d 886 (Minn. 1982), the Minnesota Supreme Court held that such a clause “should be given effect unless it is shown by the party seeking to avoid the agreement that to do so would be unfair or unreasonable.” The buyer there was a Minnesota corporation that had signed the out-of-state seller’s two-page sales agreement in an arm’s-length deal, and the court affirmed dismissal of its Minnesota lawsuit. A clause you sign in a supplier’s form can bind you the same way.
Arbitration has a treaty behind it. Under article III of the New York Convention, “Each Contracting State shall recognize arbitral awards as binding and enforce them in accordance with the rules of procedure of the territory where the award is relied upon, under the conditions laid down in the following articles.” Under 9 U.S.C. § 201, that Convention “shall be enforced in United States courts in accordance with this chapter.” Whether a court in the supplier’s country will enforce a Minnesota judgment depends on that country’s law, which is one reason to weigh arbitration for a supplier whose assets are all abroad.
Minnesota’s statute protects you in the other direction. Under Minn. Stat. § 548.57, “a court of this state shall recognize a foreign-country judgment” within the act, except as paragraphs (b) and (c) provide, and paragraph (c) lets a Minnesota court refuse recognition when “the proceeding in the foreign court was contrary to an agreement between the parties under which the dispute in question was to be determined otherwise than by proceedings in that foreign court.” A forum clause is therefore worth having even when the supplier sues first at home.
Attorney’s fees need their own term. In Brands, the Eighth Circuit held that “Because CISG article 74 does not authorize an award of attorney’s fees, the district court erred in awarding those fees to Brands.” Article 74 measures damages as “a sum equal to the loss, including loss of profit, suffered by the other party as a consequence of the breach,” but “Such damages may not exceed the loss which the party in breach foresaw or ought to have foreseen at the time of the conclusion of the contract, in the light of the facts and matters of which he then knew or ought to have known, as a possible consequence of the breach of contract.” Article 6 lets the parties vary the Convention’s provisions, so I suggest a fee-shifting clause if fee recovery matters to you, because the Convention will not supply it. I also suggest stating in the contract how you will use or resell the goods, because what the supplier knew at contracting bears on the ceiling for your damages.
What Are an Importer’s Options When the Supplier Sends Its Own Terms?
When a supplier sends its own terms, you have five routes. You can negotiate a master agreement, fix the few terms that matter in a signed order, buy through a U.S. intermediary, discuss the terms directly with the supplier, or proceed on the supplier’s form knowingly. Which route fits turns on your order volume, the value of each order, and your bargaining power with the supplier. Each fits a different volume and risk:
- Negotiate a master purchase agreement. This fits a long-term or high-value supplier. It costs time up front, and a supplier with many buyers may resist it.
- Fix the key terms in a signed order. Accept the supplier’s form for routine terms, but have both sides sign an order that states the Incoterm, the specification, the inspection window, payment triggers, and the forum. This fits a new relationship. Its risk is a conflict between documents, so the order should say which one controls. Under article 19 of the Convention, a reply that purports to accept but changes terms on “price, payment, quality and quantity of the goods, place and time of delivery, extent of one party’s liability to the other or the settlement of disputes” is “a rejection of the offer and constitutes a counter-offer.” A counter-offer can still become the contract. Under article 18, a “statement made by or other conduct of the offeree” indicating assent to an offer “is an acceptance,” though “Silence or inactivity does not in itself amount to acceptance,” so taking delivery or paying after receiving a counter-offer can accept the supplier’s terms. A reply whose changes “do not materially alter the terms of the offer constitutes an acceptance, unless the offeror, without undue delay, objects orally to the discrepancy or dispatches a notice to that effect” (article 19(2)), and without that objection “the terms of the contract are the terms of the offer with the modifications contained in the acceptance.” I suggest objecting in writing, before the goods ship, to any acknowledgment that departs from your order, because your later conduct can accept it.
- Buy through a U.S. importer or distributor. The sale is domestic, a U.S. state’s UCC governs it, and the seller is reachable in a U.S. court. You pay a markup and give up direct control of the factory relationship.
- Talk with the supplier’s owner or export manager. A direct conversation about the three or four terms that worry you can settle more than an exchange of marked-up forms.
- Proceed on the supplier’s terms. This fits a small trial order you can afford to lose. Hauenstein shows the cost: a forum clause in a signed supplier form governs where “actions arising from that contract” are brought unless the party avoiding it shows that enforcing it “would be unfair or unreasonable.”
Whatever route you choose, the supplier’s ability to perform can change after signing, and the law that governs the contract decides whether an event such as a port shutdown excuses a late delivery. Under article 79 of the Convention, “A party is not liable for a failure to perform any of his obligations if he proves that the failure was due to an impediment beyond his control and that he could not reasonably be expected to have taken the impediment into account at the time of the conclusion of the contract or to have avoided or overcome it, or its consequences.” The exemption “has effect for the period during which the impediment exists,” the supplier “must give notice to the other party of the impediment and its effect on his ability to perform,” and “Nothing in this article prevents either party from exercising any right other than to claim damages under this Convention.” Article 6 lets the parties vary these rules.
When Minnesota’s UCC governs instead, Minn. Stat. § 336.2-615 provides that, “Except so far as a seller may have assumed a greater obligation and subject to the preceding section on substituted performance,” a “Delay in delivery or nondelivery in whole or in part by a seller who complies with paragraphs (b) and (c) is not a breach of duty under a contract for sale if performance as agreed has been made impracticable by the occurrence of a contingency the nonoccurrence of which was a basic assumption on which the contract was made or by compliance in good faith with any applicable foreign or domestic governmental regulation or order whether or not it later proves to be invalid.” Under paragraph (b), when the cause affects “only a part of the seller’s capacity to perform, the seller must allocate production and deliveries among the seller’s customers,” and under paragraph (c), “The seller must notify the buyer seasonably that there will be delay or nondelivery.” The “preceding section on substituted performance” named in Minn. Stat. § 336.2-615 is Minn. Stat. § 336.2-614, which provides: “Where without fault of either party the agreed berthing, loading, or unloading facilities fail or an agreed type of carrier becomes unavailable or the agreed manner of delivery otherwise becomes commercially impracticable but a commercially reasonable substitute is available, such substitute performance must be tendered and accepted.”
Under Minn. Stat. § 336.2-616, a buyer that receives notice of “a material or indefinite delay or an allocation justified under the preceding section” may “by written notification to the seller as to any delivery concerned” either “terminate and thereby discharge any unexecuted portion of the contract” or “modify the contract by agreeing to take the available quota in substitution,” and may do so as to the whole contract “where the prospective deficiency substantially impairs the value of the whole contract.” “If after receipt of such notification from the seller the buyer fails so to modify the contract within a reasonable time not exceeding 30 days the contract lapses with respect to any deliveries affected.” Check the current text of the statute before relying on these periods. The section’s provisions “may not be negated by agreement except insofar as the seller has assumed a greater obligation under the preceding section.”
A force majeure clause in the purchase contract sets which events excuse late delivery and what happens to orders in progress.
Does choosing Minnesota law in my purchase order keep the CISG out?
Naming Minnesota law alone does not keep the Convention out if the clause never mentions it. In a 2024 dispute between a Minnesota distributor and a Canadian supplier, the Eighth Circuit said parties may opt out ‘but they must do so expressly’ under article 6 of the Convention. It quoted an earlier Fifth Circuit decision: parties who seek ’to apply a signatory’s domestic law in lieu of the CISG’ must affirmatively opt out. I suggest a sentence that names the Convention and excludes it, because a clause naming Minnesota law does not mention the Convention at all.
Is an emailed or spoken promise from my supplier binding under the CISG?
It can be. Article 11 of the Convention says a sale contract ’need not be concluded in or evidenced by writing’ and ‘may be proved by any means, including witnesses’ when the Convention applies. A country that requires written sale contracts may declare that rule inapplicable under article 96. I suggest checking the supplier’s country on the UNCITRAL status table, because that declaration changes the answer. Under Minnesota Statutes section 336.2-201, by contrast, a sale of goods for $500 or more generally needs a signed record.
What if defects show up months after the goods arrive?
It depends on whether your notice to the supplier met the content and timing rules of the law that governs your contract. Minnesota’s UCC and the Convention word those rules differently, and the Convention’s exceptions for a missed notice can preserve all or only part of your remedies. The section titled What Inspection and Quality Terms Protect an Importer? quotes each notice rule and each exception.
Do I pay the import duties if I buy on EXW terms?
Yes, as between you and the supplier. The International Trade Administration describes Ex Works (EXW) as making the buyer responsible for everything from export clearance at the start of the journey to import clearance and payment of customs duties at the end. Delivered Duty Paid (DDP) sits at the other end, placing all obligations on the seller. The same ITA guide says ‘Responsibility for meeting customs obligations at import falls on the importer of record.’
Will a port shutdown excuse my supplier's late delivery?
It depends on the law that governs your contract, the facts of the shutdown, and any force majeure clause in your contract. The Convention and Minnesota’s UCC each set their own excuse rule, and each limits what an excuse covers and what the supplier and you must do next. The section titled What Are an Importer’s Options When the Supplier Sends Its Own Terms? quotes each rule, including the UCC’s rule on a substitute port or carrier and your response options.
Can I recover my attorney's fees from a supplier who breaches?
The Convention’s damages article does not provide for them. In 2024 the Eighth Circuit held that article 74 ‘does not authorize an award of attorney’s fees’ and reversed a fee award to the winning seller. Article 6 lets the parties vary the Convention’s provisions, so I suggest a written fee-shifting clause if recovering fees matters to you, because the Convention will not supply that right.
Importing Goods Under a Written Contract
Whatever an import contract leaves out, default rules fill in. The CISG supplies them when it applies; otherwise the governing law does, which is Minnesota’s UCC for a sale bearing an appropriate relation to Minnesota unless the parties validly chose another law. Both sets of default rules can cut off a buyer who reports defects late. A contract that names the governing law, an Incoterms 2020 rule and place, a specification, and an inspection window replaces those defaults with terms you chose. So do payment triggers tied to documents or arrival and a forum that can reach the supplier. A purchase contract is one of the business agreements my contracts practice page covers.
If you are negotiating a purchase contract with a foreign supplier and want to know which of these terms matter most for your goods, email [email protected] with a brief description. I can then start an intake and conflict check before you send any confidential documents.